Do not design an OSSF until the authorized route is known.
Municipal connection requirements come first. Only when an onsite system is applicable should site conditions, expected flow, soil, setbacks, disposal area, maintenance, design, and inspections drive installation planning.
- Wastewater-service and jurisdiction review
- Site-evaluation and design coordination
- Applicable permit and inspection coordination
- Authorized installation, startup, and handoff